Change the Order of Topics in DITA Maps
You can change the order and nesting of the topics in a map in several ways:
- By dragging and dropping topics within the DITA Maps Manager.
- By showing the extended DITA Maps Manager toolbar (press the
                   Settings icon on the DITA Maps Manager toolbar and
                  select the extended toolbar) and then using the node moving buttons ( Settings icon on the DITA Maps Manager toolbar and
                  select the extended toolbar) and then using the node moving buttons (    ) on the toolbar to move
                  topics around in the map. ) on the toolbar to move
                  topics around in the map.
flowers.ditamap, located in the
            [OXYGEN_INSTALL_DIR]/samples/dita
            folder.
         
      